Figure 4-20 Operation area requirements for water-cooled modules (unit: mm)
4.2 Installation Preparation
To ensure the optimal operating condition and longest service life, install the unit
in strict accordance with requirements.
4.2.1 Tools
The onsite technical personnel can select tools based on the site requirements.
Category Tool
Personal
protective
equipment (PPE)
Safety gloves Safety goggles Anti-dust mask Safety shoes
Safety helmet Safety belt
- -
Transportation
Manual pallet
truck
Electric pallet
truck
Hoisting rope
(bearing capacity
≥ 400 kg)
Lever (bearing
capacity ≥ 400
kg)
General
Measuring tape Right angle Marker Hammer drill
NetCol8000-A(045, 055, 060, 090, 120) In-room Air
Cooled Smart Cooling Product
User Manual 4 System Installation
Issue 05 (2020-10-10) Copyright © Huawei Technologies Co., Ltd. 63