EasyManua.ls Logo

IBM SAN Volume Controller 2145-CG8 - An Open Rail-Locking Carrier at the Rear of the

IBM SAN Volume Controller 2145-CG8
372 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Position the rail at the correct height in the rack.
a. Start from the front and align the pins (1 in Figure 55 on page 72) on the front rail-locking
carrier with the holes on the rack mounting flange 2.
b. Release the rail-locking latch by pushing the smaller blue tab 3 away from the rail. The pins
spring into the closed position. Ensure that the pins go fully through the holes in the mounting
flange, as shown in Figure 55 on page 72.
c. At the rear of the rack, align the pins on the rear rail-locking carrier with the holes on the rack
mounting flange.
Figure 54. An open rail-locking carrier at the rear of the support rail for the SAN Volume Controller 2145-8A4
Chapter 2. Removing and replacing parts 71

Table of Contents

Related product manuals