Installation
48 Operating manual for INVEOR α | DOC01539818 - 0004 | 2017-01 | V2.0 EN
3.5.2 Mechanical installation
Fig.: 20 Wiring on the motor connection box
1. Open the motor connection box.
Depending on the required motor voltage, the star or triangle connection must be made in the
motor connection box!
2. Use a suitable EMC screw connection to attach the shielded motor cable to the motor
connection box!
Ensure that the shielding contact is in order (large surface)!
3. Connect the prescribed PE connection in the motor connection box!
4. Close the motor connection box.