EasyManua.ls Logo

KTM 1190 RC8 EU 2008 - 30;Assembling the Engine; Installing the Timing Chain Rails of the Left Engine Case Section; Installing the Timing Chain Rails of the Right Engine Case Section

KTM 1190 RC8 EU 2008
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
0
0
blbl
0
0
bkbk
0
0
99
0
0
88
0
0
77
0
0
66
0
0
11 0
0
22
0
0
33
0
0
44
0
0
55
30/ENGINE - WORK ON INDIVIDUAL PARTS 116
20.29Assembling the main shaft
Info
Use new lock rings and new stop disks with every repair.
Oil all parts carefully before assembling.
Check the transmission. ( p. 115)
200460-02
Fix the main shaft in the vise with the geared end facing downward.
Guideline
Use soft jaws
If removed, mount a new needle bushing using a suitable tool.
Mount needle bearing and put on the fifth-gear idler gear with the shifting claws facing upward.
Mount stop disk and a new lock ring .
Mount the third/fourth-gear sliding gear with the small gear wheel facing upward.
Mount stop disk and needle bearing .
Put on the sixth-gear idler gear with the shifting claws facing downward.
Mount the second-gear fixed gear  with the collar facing downward and mount stop disk .
Finally, check all gear wheels for smooth operation.
20.30Assembling the countershaft
Info
Use new lock rings and new stop disks with every repair.
Oil all parts carefully before assembling.
Check the transmission. ( p. 115)

Table of Contents

Other manuals for KTM 1190 RC8 EU 2008

Related product manuals