5.2011.8583.0 C
Maintenance Procedures 6-13
5. Start at the blade on top and install the knife guards (2) (see figure 61 on page 6-13) on the knives and
secure them with the locking pin (3) on the knives on the top of the mixer.
Install as many knife guards as you can safely reach while standing on the service platform.
Figure 61. Install the knife guards on the knives
KEY: 1. Knife - 2. Knife guard - 3. Locking pin
6. Carefully climb into the mixing bin.
7. Install the knife guards on the remaining knives lower in the mixing bin.