Attention: 
•  Read 
“Installation Guidelines” on page 45 and “Safety inspection checklist” on page 46 to ensure that you 
work safely.
•  Power off the server and disconnect all power cords for this task.
•  Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static- 
sensitive components in their static-protective packages until installation, and handling these devices with 
an electrostatic-discharge wrist strap or other grounding system.
Watch the procedure 
A video of this procedure is available at YouTube: 
https://www.youtube.com/playlist?list=PLYV5R7hVcs- 
DrpxDWLMfgtXO4O6BVYTim
. 
Procedure
Step 1.  Touch the static-protective package that contains the RAID flash power module to any unpainted 
surface on the outside of the server. Then, take the RAID flash power module out of the package 
and place it on a static-protective surface.
Step 2.  If the server comes with a tray that covers the place of the RAID flash power module on the chassis, 
remove it first. 
Figure 107. Tray removal
162 ThinkSystem SR635 V3 User Guide