EasyManua.ls Logo

Manitowoc Grove GMK6300L-1

Manitowoc Grove GMK6300L-1
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Driving modes
6.4 Main boom, removing/installing
6 - 42 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
6.4.13 Inspections after main boom mounting
Check to see if the pressure relief is switched off and is secured with the
lock;
à p. 6 - 29.
Switch on the ignition.
Check if the RCL control unit (1) or ECOS (2)
show an error message.
If an error message is displayed, check that
all electrical connections are established;
à p. 6 - 36.
The following requirements must be met for the subsequent inspection:
The truck crane is supported on outriggers.
The main boom is resting in the boom rest.
The current rigging mode is entered on the RCL.
Telescope the telescopic section approx. 1 m out and back in.
Retract the telescoping cylinder into another telescopic section and
mechanically lock it there.
Check to see if the hydraulic connections in the turntable are sealed.
H
Before operating for the first time, carry out the movement Incline lattice
extension
with the hydraulically derricking lattice extension and check if the
corresponding connections in the turntable are sealed.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Related product manuals