Malfunctions during crane operation
14.5 Emergency operations and programs
Operating Manual GMK6300L 3 112 xxx en 14 - 59
xx.xx.xxxx
14.5.4 Emergency operation with the hand-held control
If the power units no longer respond to the operating elements in the crane
cab, you can operate the power units with the hand-held control.
Operating them with the hand-held control is intended for emergencies only
and for bringing the truck crane into a safe state or to shut it down.
Preparations You have to connect up the hand-held control and start the engine.
Connecting the hand-held control
• Connect the hand-held control to the
connector (1).
All power units can be operated from this
connection.
Information on connecting;
à p. 12 - 21.
Start the engine
• Press the (1) button once – the engine starts; à p. 10 - 19.
s
G
Danger of overturning due to deactivated monitoring function!
The RCL is switched off and the crane operations are not monitored when
operating with the hand-held control. If you move into a critical range, the
truck crane will overturn.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals