Driving modes
6.6 Installing/removing the supporting box
6 - 70 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
6. – Establish the hydraulic connection; à p. 6 - 76.
– Establish electrical connection;
à p. 6 - 75.
7. Pin the supporting box to the carrier;
à p. 6 - 83.
8. Install the reverse camera on the carrier;
à p. 6 - 80.
9. Where necessary, disconnect the pneumatic connections between the
carrier and supporting box;
à p. 6 - 74.
10. If the truck crane is at the site:
– Retract the auxiliary supporsts;
à p. 6 - 72,
– Extend all outrigger beams to the necessary outrigger span, secure
them and stabilize the truck crane;
à CHECKLIST: Extending the
outriggers
, p. 12 - 27.
11. If the truck crane has to be driven to the site:
With the RCL set accordingly, slew the superstructure to the front and
set down the main boom;
à Crane movements during installation and
removal
, p. 6 - 81.
– Retract the front outrigger cylinders and outrigger beams and secure;
à CHECKLIST: Retracting the outriggers, p. 12 - 29,
– Place the outrigger pads in the driving position;
à p. 12 - 39,
– Retract auxiliary support;
à p. 6 - 72.