EasyManua.ls Logo

Manitowoc Grove GMK6300L-1

Manitowoc Grove GMK6300L-1
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Driving modes
6.6 Installing/removing the supporting box
6 - 78 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
Lifting Raise the main boom until you are able lift the supporting box upwards in
an upright position.
If the supporting box is to be placed on a separate vehicle:
Move the separate vehicle up to the truck crane so that you can set down
the supporting box without overriding the RCL;
à p. 6 - 85.
Do not override the RCL!
Lift the supporting box vertically out of the
carrier retainers (1) with the truck crane.
Hold the supports (1) and remove the retain-
ing pins (2).
Extend the supports (1).
Secure the supports (1) by inserting the lock-
ing bolts (2) into the upper hole.
Bring the outrigger pad (2) to the working-
position;
à p. 12 - 39.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Related product manuals