EasyManua.ls Logo

Manitowoc Grove GMK6300L-1

Manitowoc Grove GMK6300L-1
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Correction sheet GMK6300L/GMK6300L-1 3 302 838 en 1
23.11.2018
Contrary to the specifications in the operating manual supplied, the valve 7, if
present, can also be closed for the crane movements
Lifting and Lowering.
This increases the hoist speed.
H
Always close the valve 7 in addition to all other switches that are specified
in the
operating manual supplied for the movements Lifting and Lowering.
(A) – For lifting and lowering in emergency
operation
Close the valve 7 – lever (1) at right angles
to the line.
(B) – For crane operation
Open the valve 7 – lever (1) parallel to
the line.
Hydraulic emergency operation
Additional switches required

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Related product manuals