Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 3
xx.xx.xxxx
9. Turn off the engine for driving; à Switch the engine off, p. 4 - 23.
10. Earth the truck crane, if necessary;
à Earthing the truck crane, p. 12 - 13.
11. Fold out all ladders;
à , p. 4 - 6.
12. Inspect the truck crane, while looking out in particular for any leaking
fluids (oil, fuel or water).
13. Extend step;
à Extendable step, p. 12 - 122.
14. Start the engine for crane operation;
à p. 10 - 12.