EasyManuals Logo

Manitowoc Grove GMK6300L-1 User Manual

Manitowoc Grove GMK6300L-1
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #763 background imageLoading...
Page #763 background image
Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 5
xx.xx.xxxx
21. If required, assemble the auxiliary hoist; à CHECKLIST: Auxiliary
hoist, installing
, p. 6 - 89.
22. With the RCL adjusted accordingly, rig the counterweight combination
required for the operation according to
Lifting capacity table;
à CHECKLIST: Rigging the counterweight, p. 12 - 58.
23. Enter the current rigging mode with the newly rigged counterweight
combination on the RCL;
à p. 11 - 23.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals