Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 5
xx.xx.xxxx
21. If required, assemble the auxiliary hoist; à CHECKLIST: Auxiliary
hoist, installing
, p. 6 - 89.
22. With the RCL adjusted accordingly, rig the counterweight combination
required for the operation according to
Lifting capacity table;
à CHECKLIST: Rigging the counterweight, p. 12 - 58.
23. Enter the current rigging mode with the newly rigged counterweight
combination on the RCL;
à p. 11 - 23.

Table of Contents