Rigging work
12.6 Outriggers
Operating Manual GMK6300L 3 112 xxx en 12 - 33
xx.xx.xxxx
Outrigger span 8.70 x 7.40 m (28.5 x 24.3 ft)
(A) – Prerequisites
– Pin (1) must be removed
– Pin (2) inserted in holder (3)
(B) – Setting and securing
• Extend the outrigger beam up to the
mark (4).
• Secure the outrigger beam with the pins (1)
and (2).
• Set the outrigger spans on the other outrig-
ger beams in the same way.
Outrigger span 8.70 x 6.30 m (28.5 x 20.4 ft)
(A) – Prerequisites
– Pin (1) must be removed
– Pin (2) must be inserted
(B) – Setting and securing
• Extend the outrigger beam up to the
mark (3).
• Secure the outrigger beam with the pin (1).
• The pin (2) remains inserted.
• Set the outrigger spans on the other outrig-
ger beams in the same way.
s

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals