EasyManua.ls Logo

Manitowoc GROVE GMK7450 - Page 195

Manitowoc GROVE GMK7450
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance work on the carrier
7.18 Other maintenance work
16.08.2018
Maintenance manual 3 302 577 en 7 - 123
GMK7450
7.18.6 Renewing the corrosion protection
Protective agent,
tools
Spray gun with spray extension.
–Brush.
Protective clothing, protective goggles.
Prerequisites The undercarriage of the truck crane must be thoroughly cleaned.
The truck crane must be raised on outriggers or parked over an inspection
pit.
The
engine must not be running and must be secured against unauthor-
ised use;
à P. 2 - 3.
Checking At the factory, the underside of the carrier was sprayed with corrosion pro-
tection for the first time.
The corrosion protection is solvent-free and is water soluble while being
sprayed on. A transparent, waxy, pro
tective film is formed after a drying
time of one hour.
Check the condition of the original protective film.
If required, remove any rust and touch up the paintwork before you spray
on a new protective film.
Processing
instructions
Observe the processing instructions for corrosion protection:
Working temperature: above10 °C (50 °F).
Removability before drying: with water.
Removability before drying: with test petrol.
Drying time: 1 hour.
s
M 12
Protective agent GROVE part no.
Corrosion protection 03140192

Table of Contents

Related product manuals