EasyManua.ls Logo

Manitowoc GROVE GMK7450 - Page 48

Manitowoc GROVE GMK7450
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance overview
5.2 Maintenance plans
5 - 16 3 302 577 en Maintenance manual
GMK7450
16.08.2018
5.2.7 Maintenance plan Y 2
Y 2
Maintenance work on the CARRIER:
every 24 months / after 40, 000 – 50, 000 km (25 000 – 31 000 mi)
Engine
–Notes;
à Engine manufacturer’s documentation à P. 7 - 11
Transmission
Changing the oil and oil filter
à P. 7 - 47
Other maintenance work
Having the fire extinguisher checked
à P. 7 - 125
Maintenance work on the SUPERSTRUCTURE:
every 24 months/after 2,000 oper. hrs.
Engine
–Notes;
à Engine manufacturer’s documentation à P. 8 - 13
Other maintenance work
Having the fire extinguisher checked
à P. 8 - 131

Table of Contents

Related product manuals