EasyManua.ls Logo

Manitowoc GROVE GMK7450 - Page 49

Manitowoc GROVE GMK7450
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance overview
5.2 Maintenance plans
16.08.2018
Maintenance manual 3 302 577 en 5 - 17
GMK7450
5.2.8 Maintenance plan Y 3
5.2.9 Maintenance plan Y 5
Y 3
Maintenance work on the CARRIER:
every 36 months
Engine
–Notes;
à Engine manufacturer’s documentation à P. 7 - 11
Maintenance work on the SUPERSTRUCTURE:
every 36 months/after 3,000 oper. hrs.
Engine
–Notes;
à Engine manufacturer’s documentation à P. 8 - 13
Hoists
Having a partial inspection carried out
à P. 8 - 48
Y 5
Maintenance work on the CARRIER:
every 60 months / 100, 000 km (62 000 mi)
Engine
–Notes;
à Engine manufacturer’s documentation à P. 7 - 11
Have the Cardan shaft between the transmission on the engine and the trans-
fer case replaced by
Manitowoc Crane Care or an authorised GROVE dealer.
Maintenance work on the SUPERSTRUCTURE:
every 60 months/after 5,000 oper. hrs.
Engine
–Notes;
à Engine manufacturer’s documentation à P. 8 - 13

Table of Contents

Related product manuals