Leak and Compliance Tests Preoperative Tests
4 - 16 046-003777-00 A5/A3™ Operating Instructions
Fail
Example:
Manual Circuit Leak Test failed.
Fresh gas is not detected.
Follow on-screen instructions to troubleshoot the
problem.
or
Adjust APL valve to SP position and select Accept to
proceed to the main screen.
Time out
Example:
Test result cannot be shown due to an internal
communication error.
Select Retry to repeat the Automatic Circuit Leak Test &
Compliance Test. In certain rare instances, after pressing
"Retry" the manual circuit leak test will be performed, but
the progress bar will be blank and will not show that the
manual leak test was completed. If this anomaly occurs,
press the Cancel button on the screen to continue.
or
Select Accept to proceed.
RESULTS COMMENTS/OPTIONS
TABLE 4-4 Manual Circuit Leak Test Results