EasyManua.ls Logo

Mitsubishi GOT1000 GT15 - Page 115

Mitsubishi GOT1000 GT15
622 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.4 Precautions for Wiring/Connecting the EMC Directive-Compliant Product
5.4.2 Processing connection cables
5 - 21
1
OVERVIEW
2
SYSTEM
CONFIGURATION
3
SPECIFICATIONS
4
PART NAME AND
SETTINGS
5
EMC AND LOW
VOLTAGE
DIRECTIVE
6
INSTALLATION
7
WIRING
8
OPTION
(5) CC-Link IE Field Network connection and Ethernet connection
Strip the outer insulation layer at both ends of the cable by the length shown below to expose the
braided shield for grounding. (For grounding with cable clamps. (refer to Section 5.4.3.))
Attach the ferrite core to the cable in the position as illustrated below.
(6) External I/O device connection
Strip the outer insulation layer at both ends of the cable by the length shown below to expose the
braided shield for grounding.(For grounding with cable clamps (Refer to Section 5.4.3.))
Connect the braided shield to the connector with the connector cover.
Twist power cables.
GOT side Controller side
Ferrite Core
(ZCAT3035-1330)
120 or
less
(4.72)
230 or less
(9.06)
400 or less
(15.75)
(1.57)
40
(1.57)
40
Unit : mm (inch)
Connector cover
Braided shield
GOT side External I/O device side
360 or less 360 or less40 40
Unit : mm (inch)
Power cable
(14.17) (14.17)
(1.57) (1.57)

Table of Contents

Related product manuals