ProBlue Flex 400/480 Volt Transformer
F-3
Part 1128350_02
E 2020 Nordson Corporation
Installation
WARNING! Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
Installation Tasks
Before starting the installation, locate the ship-with kit and inspect for
damaged and missing parts. Report any problems to your Nordson
representative.
The installation sequence is as follows:
1. Verify that the desired installation location provides the required
clearance, environmental conditions, and utilities.
2. Remove the transformer from the shipping container and inspect.
NOTE: Retain the two side spacers from the transformer shipping
container. These are used while installing the ProBlue F lex melter on the
transformer. See figure on the left (spacers highlighted in grey).
3. Verify that the transformer is correctly sized for the number and type of
hoses/applicators you intend to use.
4. Mount the transformer onto the parent machine or support structure.
5. Mount the melter onto the transformer.
6. Configure the electrical service.