Hose/Applicator Expansion Base
G-10
Part 1128350_02
E 2020 Nordson Corporation
Connecting Expansion Base and Sub-base Wiring to the Melter
Figure G-8 shows the location of the connections on the boards.
1. To connect the wiring from the expansion base to the melter do the
following:
a. Connect the ground lead from the sub-base to the lug at the bottom of
the melter electrical enclosure (Figure G-7).
b. Connect the ground lead from the expansion base to the lug at the
bottom of the melter electrical enclosure (below the cards).
2. Slide the chassis cover place into place and install the chassis cover
screw.
3
5
6
1
2
4
Figure G-7 Connecting ground wire from expansion base (some components not shown)
1. Sub-base
2. Chassis
3. Chassis cover plate screw
4. Chassis cover plate
5. Sub-base ground wire
connection
6. Chassis ground wire
connection