Front Control Panel Removal and Replacement 10-7
Remove the Front Control Panel 10-8
Replace the Front Control Panel 10-9
Module Controller Removal and Replacement 10-10
Remove the Module Controller 10-10
Replace the Module Controller 10-11
Robot Module Removal and Replacement 10-12
Remove the Robot Module 10-12
Park and Lock the Robot 10-12
Slide Robot CRU Out of Base Module 10-13
Manually Retract the Robot 10-13
Manually Disengage the Robot 10-14
Cut the Robot Cables 10-15
Manually Remove the Robot CRU 10-15
Manually Remove the Z Platform 10-15
Clean Up After Manually Removing the Robot 10-16
Replace the Robot Module 10-16
Reinsert the Robot CRU and Unlock the Robot 10-16
Reconnect Cabling to the Base 10-16
Expansion Module Chassis Removal and Replacement (FRU) 10-17
Remove an Expansion Module 10-17
Power Down, Lock the Robot, and Remove Magazines 10-18
Remove the Floor, Cables, and Cords 10-18
Remove Operational Expansion Modules Below the Defective Module 10-19
Remove Components from the Defective Module 10-19
Replace the Expansion FRU Chassis 10-20
Install the Expansion Module Chassis 10-20
Install CRUs, Fillers, and Magazines in Replaced Module 10-20
Install the Remaining Expansion Modules 10-21
Cable the Library and Power On After Installing the Expansion Module 10-21
Base Module Chassis Removal and Replacement (FRU) 10-22
Remove the Base Module Chassis 10-22
Lock the Robot and Remove Expansion Modules 10-23
Remove Base Chassis and Parts for Reuse 10-23
Replace the Base Module Chassis 10-23
Install the Base Module into the Rack 10-23
Install the Base Module CRUs and Expansion Modules 10-24
Reinstall Magazines and Dress the Cables 10-24
Validate the Component Installation 10-25
Return CRU Components to Oracle 10-25
Lock the Robot for Shipment within a Rack 10-25
x