Maintenance driven roller conveyor
104 UM-PRORUNNER_Mk5-1.2-EN-US
12.2 Preventive maintenance schedule, driven roller carriers
12.2.1 Weekly maintenance during the first 8 weeks after putting into
operation
/i
12.2.2 Daily maintenance
/i
12.2.3 Weekly maintenance
/i
Item Task Action when required by the
check
Conveyor belt Tighten the conveyor belt. Refer to section 12.9.
Item Task Action when required by the
check
Guards and covers Check for visible damage. Replace damaged guards and /
or covers.
Check if the mounting materials
are present and have been cor-
rectly placed.
Place the mounting materials or
correct the way in which they
have been fastened.
Entire machine Check for visible dirt. Clean the machine. Refer to
section 12.3.
Item Task Action when required by the
check
Drive belt Check for visible damage to the
surface and sides.
Replace the belt. Refer to sec-
tion 12.10.
Clean. Refer to section 12.3.
Drive pulley Check for damage of the run-
ning surface and bearings.
Replace the drive pulley. Refer
to section 12.10.
Clean. Refer to section 12.3.
Check for running sounds. Lubricate the drive pulley bear-
ings. Refer to section 12.4.1.
Return wheels Check for damage. Replace the return wheel. Refer
to section 12.10.
Check if the fastening bolt on
the carrying shaft is present
and has been correctly fixed.
Replace the return wheel. Refer
to section 12.10.
Clean. Refer to section 12.3.
Pressure roller Check for dirt. Clean. Refer to section 12.3.
Check for visible deformation. Replace the pressure roller.
Refer to section 12.10.
Make sure the rollers run freely
and smoothly.
Replace the pressure roller.
Refer to section 12.10.