Maintenance vertical conveyor
60 UM-PRORUNNER_Mk5-1.2-EN-US
7.2 Preventive maintenance schedule, machine excluding the
carrier
7.2.1 Weekly maintenance during the first 8 weeks after putting into
operation
/i
7.2.2 Daily maintenance
/i
7.2.3 Weekly maintenance
/i
Item Task Action when required by the
check
Chain Tighten the chain. Refer to sec-
tion 7.7.
Item Task Action when required by the
check
Guards and covers Check for visible damage. Replace damaged guards and /
or covers.
Check if the mounting materials
are present and have been cor-
rectly placed.
Place the mounting materials or
correct the way in which they
have been fastened.
Entire machine Check for visible dirt. Clean the machine. Refer to
section 7.3.
Item Task Action when required by the
check
Wheels of the trolley Check for visible damage of the
running surface and bearings.
Replace the wheels. Refer to
section 7.8.2.
Clean. Refer to section 7.3.
Check for running sounds. Lubricate the wheels of the trol-
ley. Refer to section 7.4.2.
Wheels of the guide Check for damage of the run-
ning surface and bearings.
Replace the wheels. Refer to
section 7.8.5.
Clean. Refer to section 7.3.
Check for running sounds. Lubricate the wheels of the
guide. Refer to section 7.4.3.