Installation
6.5.2 Installing a pre-assembled machine
1. Position the machine using a hoisting
system. Refer to section 6.3.3 and 6.3.4.
2. Check if the machine is completely level.
3. Anchor the machine (A).
4. Disconnect the hoisting belt, the hoisting
chain, or the yoke.
5. Remove the transport supports (A).
6. Remove the shaft (A).
7. Check the tension of the chain. Refer to
section 7.7.
Tip
The procedure below shows the set-up of an assembled machine as a whole.
Note
Use Fischer FBN II 12/100 bolts or
equal.
These are not by default delivered
by Qimarox. See the bolts specifi-
cations for information on the sup-
plier.
A
A
A
A
A
A
A
A
A
Tip
Keep the transport supports and
shaft for any future transport.
A
B

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Qimarox PRORUNNER Mk5 and is the answer not in the manual?

Qimarox PRORUNNER Mk5 Specifications

General IconGeneral
BrandQimarox
ModelPRORUNNER Mk5
CategoryAccessories
LanguageEnglish