Maintenance vertical conveyor
82 UM-PRORUNNER_Mk5-1.2-EN-US
7.8.12 Replace the motor reductor
Uninstall the motor reductor
1. Remove the motor reductor (A) from the
reactor bar (B).
2. Remove the motor reductor (C) from the
axle.
Uninstall the main shaft
1. Remove the main shaft (A) from the
bearing.
Note
Make sure that the key (D) does not
fall.