IIT-2000/2010/5000/5010 Instruction Manual/English
05/08/2015 Version No. 001 103
following conditions:
Any protection modes have been tripped.
The INTERLOCK function is ON and the Interlock key is not
inserted in the signal I/O port (page 127).
The STOP signal has been received remotely.
If Double Action is ON, ensure the START button is pressed
immediately after the STOP button (<0.5s).
Do not touch any terminals, test leads or the DUT when a test
is running.
1. Ensure the tester is in VIEW status. Save the
automatic test if necessary.
I R G B A CW D CW
E
F R E Q = 0 H z 6
0
100
k V
EIV
MT I E = 0 0 1 . 0 SR
0 0 m AER F =# 0 .0
1 . 0 0 m AIH ES = 0T
0 0 . 1 S0A M P =R
W
MA U OT N A_0A U T O = 0 0 1 - 1 0
VIEW status
m A
2. Press the STOP button to put the tester into the
READY status.