EasyManua.ls Logo

RS PRO IIT-2000 - Page 105

RS PRO IIT-2000
221 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IIT-2000/2010/5000/5010 Instruction Manual/English
05/08/2015 Version No. 001 103
following conditions:
Any protection modes have been tripped.
The INTERLOCK function is ON and the Interlock key is not
inserted in the signal I/O port (page 127).
The STOP signal has been received remotely.
If Double Action is ON, ensure the START button is pressed
immediately after the STOP button (<0.5s).
Warning
Do not touch any terminals, test leads or the DUT when a test
is running.
Steps
1. Ensure the tester is in VIEW status. Save the
automatic test if necessary.
Page 93
I R G B A CW D CW
E
F R E Q = 0 H z 6
0
100
k V
EIV
MT I E = 0 0 1 . 0 SR
0 0 m AER F =# 0 .0
1 . 0 0 m AIH ES = 0T
0 0 . 1 S0A M P =R
W
MA U OT N A_0A U T O = 0 0 1 - 1 0
VIEW status
m A
2. Press the STOP button to put the tester into the
READY status.
STOP

Table of Contents

Related product manuals