Basics
1-30
● Arrangement of standard solution stations (with drying stations)
In the standard mode, the arrangement and number of stations vary depending on whether the solution
stations are arranged "without special solution stations" or "with special solution stations."
Figure Arrangement without Special Solution Stations
Figure Arrangement with Special Solution Stations
Fixed station numbers are assigned to the start stations (S1 to S3), end stations (linked), (E1-1 to E1-5),
end stations (not linked) (E2-1 to E2-5), wash stations (W1 to W4), drying stations (D1, D2) and link
station (LINK). The tables below specify the identification number of each station attribute and the
corresponding station number. The rightmost end station is selected as the PE station.
Without special solution stations
Without special solution stations
With special solution stations
With special solution stations
* S2 and S3 can also be set as solution stations. * E1-2 to E1-5 can also be set as solution stations.
Without special solution stations
With special solution stations
* E2-2 to E2-5 can also be set as solution stations.
Without special solution stations
Without special solution stations
With special solution stations
With special solution stations
Without special solution stations
With special solution stations
* When a drying station unit is installed.
Without special solution stations
With special solution stations
* The link station can be set only when the instrument is
connected to an automated coverslipper.
* W1 to W4 can also be set as solution stations.