Flow of Stain Process Operation
This section explains a series of operating procedures.
Flow of Stain Process Operation
A basic flow of normal operation is shown below.
● Preparation for Operation Standby
Refer to P. 2-2 for details.
• Start the water supply.
• Turn on the power and log on to the instrument.
● Preparation for Staining
Refer to P. 2-3 for details.
• Open the lid of each solution reservoir to check the solution level.
• Select a solution configuration.
Refer to P. 2-5 for details.
• Select a staining program.
• Set staining baskets in the start station.
Operations permitted during staining (P. 2-7)
To perform another staining run
consecutively, add staining baskets.
* Applicable only in the continuous mode.
Refer to P. 2-12 for details.
• Remove the stained baskets from the end station.
Refer to P. 2-12 for details.
• Turn off the power and stop the water supply.
• Close the lid of each solution reservoir.