1. Open the tap water faucet so that water can be supplied.
2. Hold the center of the cover and raise while pulling it toward you to open the cover and remove the lid
of each solution reservoir.
Be sure to remove all lids. If any lid remains closed, tissues may be damaged when the baskets are
transferred to the applicable station.
1. The user must log on to the instrument to
start instrument operation. Only one user
can log on to the instrument at a time.
When the power switch located at the
bottom right of the instrument is turned on,
the display shows a message indicating
that the instrument is loading data. After a
while, a confirmation screen on instrument
use appears. After confirming the items,
touch the OK button to return to the Stain
Process Monitor screen.
Touch the Start button under "Confirm Water Supply," and you can perform a water supply test. Touch
the Stop button to stop the water supply.
2. When the Stain Process Monitor screen appears, touch the Log On key at the bottom left. When the
Enter Password sub-window appears, enter a pre-assigned password using the numeric keypad
(number keys 0 to 9) shown on the display. If you have made a mistake, touching the Backspace key
deletes the last character entered. Alternatively, you can touch the Cancel key to cancel the password
entry and return to the Stain Process Monitor screen. Refer to P. 1-39 for passwords.
3. After the password has been entered, touch the Enter key to complete the logon.
Logging off
To log off from the instrument, touch the Log Off key at the bottom left of the screen. You can log off
from the instrument even after staining has started. Once the user logs off, the instrument only accepts
the operation inputs to check the staining status, which prevents inadvertent operations by different
users. To perform other operations, the user must log on to the instrument again.