96 FLOWSIC100 Flare-XT · Operating Instructions · 8023761/V 1-0/2020-10 · © SICK Engineering GmbH
Installation Interface Unit
6. 4
Installation
6.4.1 Safety information
6.4.2 Scope of delivery
▸
Check that delivery includes all ordered parts.
▸
Check parts for possible transport damage.
6.4.3 Tools required
● Allen keys SW 6 and 8
● Jaw wrenches size 13, 17 and 19
● Drill and tools for wall fitting
WARNING: Risks during installation
▸
Observe the safety information in
p. 86, §6.2.
▸
Observe and comply with regulations of the plant operator.
Otherwise hazards are possible and safe operation is not ensured.
CAUTION: Accident risk through inadequate fastening of the device
▸
Consider the device weight specifications when planning the mounting
supports.
▸
Ensure sufficient stability:
– When fitting the device on a wall, ensure that the wall construction is
sufficiently stable.
– When fitting the device on a pipe, ensure sufficient stability of the pipe.
▸
Use suitable fasteners to secure the device and optional accessories.
▸
Take the vibration load into account.
NOTICE:
The plant operator is responsible for the safety of the system under mechanical
load.
NOTICE:
The Interface Unit is only suitable for vertical installation.
NOTICE:
Do not put the interface Unit into operation if you notice any damage!