7SR11 & 7SR12 Commissioning and Maintenance Guide
©2017 Siemens Protection Devices Limited Chapter 6 Page 31 of 72
Calculated Timing values in seconds for TM =1.0
Curve
2 xIs
5 xIs
IEC-NI
10.03 4.28
IEC-VI
13.50 3.38
IEC-EI
26.67 3.33
IEC-LTI
120.00 30.00
ANSI-MI
3.80 1.69
ANSI-VI
7.03 1.31
ANSI-EI
9.52 1.30
Note that the operate time may be subject to the Minimum op time setting for the element and/or may have a
Follower DTL applied.
If VTS action is set to BLOCK, this option should be tested. Apply balanced voltage and current. Reduce a-phase
voltage to cause a VTS condition. Increase a-phase current and check that the element does not operate.
If VTS action is set to Non-Directional, this option should be tested. Apply balanced voltage and current. Reduce
a-phase voltage to cause a VTS condition. Increase a-phase current and check that the element operates at its
normal setting. Reverse the voltage phase direction whilst checking that the element does not reset.
2.8.3.1 Element Blocking
The Measured Earth Fault elements can be blocked by Binary Input Inhibit, VT Supervision and Inrush Detector
operation. The Characteristic can be made non-directional by VT Supervision. This functionality should be
checked.
Element
BI Inhibits
VTS action
Inrush Detector
51G-1
51G-2
51G-3
51G-4
50G-1
50G-2
50G-3
50G-4

Table of Contents