7SR11 & 7SR12 Applications Guide
Page 40 of 48 ©2017 Siemens Protection Devices Limited
4.2 Quick Logic Applications
4.2.1 Auto-Changeover Scheme Example
INCOMER 1 INCOMER
2
Start On
-
Load
Change-
over
CB
1
OPEN
VT1
VT2
CB
1
CB2
CB3
BI 1
BO3
V 1
Vx
Start On
-Load
Change
-over
Busbar
1
Busbar 2
LOADS LOADS
Panel Enable
Switch
BI 2
Figure 4.2-1 Example Use of Quick Logic
The MV installation illustrated above is fed from two incomers. To limit the substation fault level the busbar is run
with CB3 open. When a fault occurs on one of the incomers it is isolated by the circuit protection. To re-supply the
disconnected loads from the remaining incomer CB3 is closed.
If the line fault occurs on incomer 1 it must be confirmed that CB 1 has opened before CB3 can be closed. The
relay on incomer 1 confirms that a trip has been issued to CB1 (e.g. Binary Output 2), that CB 1 has opened (e.g.
Binary Input 1) and that no current flows in the circuit (e.g. 37-1 = Virtual 1):
Incomer 1 Relay is Configured:
CB1 Open auxiliary switch wired to BI 1
Trip output to CB1 = BO 2
OUTPUT CONFIG>OUTPUT MATRIX: 37-1 = V1
OUTPUT CONFIG>OUTPUT MATRIX: E1 = BO3
CONTROL & LOGIC>QUICK LOGIC: E1 = O2.I1.V1
The output from Incomer 1 (Binary Output 3) relay is input to the relay on CB 3 (Binary Input 1). A panel switch
may be used to enable the On-Load Change-over scheme (Binary Input 2). Before Closing CB3 a check may be
made that there is no voltage on busbar 1 (27/59-1 = Virtual 1). CB 3 is closed from Binary Output 3.
CB3 Relay is Configured:
Panel switch (ON-Load Change-over Enabled) wired to BI2
OUTPUT CONFIG>OUTPUT MATRIX: 27/59-1 = V1
OUTPUT CONFIG>OUTPUT MATRIX: E1 = BO3
CONTROL & LOGIC>QUICK LOGIC: E1 = I1.I2.V1
If required a time delay can be added to the output using the CONTROL & LOGIC > QUICK LOGIC: E1
Pickup Delay setting.