10.2 Visualization interface
10.2.1 Structure of the picture hierarchy
You can create a hierarchical structure for the plant with up to 8 levels. Buttons are used to
navigate between the process pictures.
EHUVLFKW
(EHQH
(EHQH
(EHQH
The process pictures are assigned during AS engineering of the navigation in the SIMATIC
Manager. The name displayed for the OS area can also be changed in the SIMATIC Manager.
As a rule, however, the same name as that shown in the plant view is used.
Configuring OS functions
10.2 Visualization interface
Compendium Part A - Configuration Guidelines (V8.2)
224 Configuration Manual, 08/2016, A5E38166869-AA