9. Click the "Add" button if you want to insert IPCs or other components with SNMP
functionality.
The "Add node" dialog box opens.
10.Enter all required data.
Proceed as described in item 7.
11.Click "OK".
The "Add node" dialog box closes and you return to the "Edit plant configuration" dialog
box.
12.Insert additional nodes as required.
13.Click "OK".
The configuration is complete.
14.Compile and download the hardware configuration.
Additional information on this is available in the
Process Control System PCS 7;
Engineering System
manual.
5.9.4 How to insert the OPC server into the redundant partner
Requirement
The OPC server is configured in the MS server.
You can find additional information on this topic in the section "How to assign components with
SNMP functionality to the OPC server (Page 46)".
Procedure
1. In SIMATIC Manager, open the component view.
2. Select the SIMATIC PC station of the MS server.
3. In the detailed view, open HW Config by double-clicking the "Configuration" object.
The hardware configuration of the SIMATIC PC station opens.
4. Select the OPC server.
5. Select Edit > Copy from the menu.
6. Select the SIMATIC PC station of the redundant partner.
7. In the detailed view, open HW Config by double-clicking the "Configuration" object.
The hardware configuration of the SIMATIC PC station opens.
8. Select the position for the OPC server.
9. Select the Edit > Paste command.
10.Select the Station > Save and Compile command.
Configuring the maintenance stations
5.9 Configuring the monitoring of industrial PCs and network objects
Maintenance Station
48 Function Manual, 03/2016, A5E36187641-AA