EasyManua.ls Logo

SWF Dual Function E Series

Default Icon
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.4.0
Machine Setting and Troubleshooting (Dual DM Series)
After power cord connection, if power is not supplied after switch-on, troubleshooting actions need to be taken with
reference to the following. Check the location of fuses as in <Fig. 7.4.1-1> and <Fig. 7.4.1-2> and change fuses.
(1) Power Fuse (based on 3-phase)
[Fig.7.4-1]
< Front side of Control Box >
Fuse specifications: 250V , 30A , 31.8mm
Fuse quantity : 3EA

Table of Contents

Related product manuals