74 097-55501-01 Issue 6 – June 2003
1
TimeHub 5500 System Guide
3.1 Overview
Install the TimeHub 5500 using the sequence given in this chapter. To take
the TimeHub 5500 to full operational status, complete both this chapter
(Installation) and the next chapter (Operational Verification & Configuration).
This chapter covers steps to install the TimeHub 5500 system in preparation
for power-up. The next chapter covers steps to be taken once power has
been applied.
If any difficulties are encountered during the installation process, contact
Symmetricom’s CAC. Refer to the Technical Assistance section of the
Maintenance chapter for telephone numbers.
CAC includes Product Technical Support for technical information, and
Customer Service for information about an order, RMAs, and other
information.
3.2 Unpacking
Unpack equipment carefully; check for completeness against the purchase
order. Notify Symmetricom if items are missing.
Inspect equipment for shipping damage, including bent or loose hardware,
and broken connectors.
If equipment was damaged in transit, contact Customer Service to request
an RMA, and notify the carrier.
W
ARNING
: When handling electronic equipment, use local office
procedures regarding electrostatic discharge (ESD) including:
• Use grounded wrist straps connected to equipment frame
ground when handling cards.
• Store cards only in antistatic packaging provided by the
factory.
N
OTE
: Save packing material. All equipment returned must be
packed in the original packing material. Contact Customer
Service if additional packaging is needed.