EasyManua.ls Logo

Systec DB-45 - 5.1 Regular Tests and Maintenance

Default Icon
219 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
V/D
S
ERIES
R
EGULAR TESTS AND MAINTENANCE
Revision: 2.1 5-3
5.1 Regular tests and maintenance
The regular maintenance tasks are described below.
Aside from a brief description of the maintenance tasks, you may find a
reference in the table for more detailed information elsewhere in this
service manual.
You will find overview drawings of the open device showing the positions
of the mechanical components in chapter 3.2, “Position of the
components” and drawings of the electrical assemblies in chapter 4.1
Overview – Electrical assemblies ” and chapter 4.2 “Overview – Electrical
assemblies on D-23”.
The following list is based on the maintenance checklist
Log your work here, mark the corresponding field and send the
maintenance checklist to Systec GmbH.
5.1.1 General inspections
Handling Teflon hoses and connections
Pay attention to the following points when handling Teflon
hoses:
− Do not kink the hoses.
− Avoid excess mechanical strain on the Teflon hoses.
− When reconnecting, push the connections completely
onto the fittings and tighten the lock-nuts up to the
stop.
− If white stress marks can be seen on a hose, replace it
– white marks on Teflon hoses indicate damages.
− When shortening hoses, cut at right angles using a
sharp knife (do not pinch off or crimp using side
cutters or similar tools).
Perform a test run after service and maintenance
After service or maintenance you must always perform a test
run and check the equipment for anything unusual (e.g. leaks,
noises).

Table of Contents