EasyManua.ls Logo

Systec DB-45 - Electrical Connection; Water Supply; Testing the Water Quality; Connecting the Cooling Water Supply (X and E Series)

Default Icon
219 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
V/D
S
ERIES
C
OMMISSIONING
Revision: 2.1 2-15
2.3 Electrical connection
Checking the safety equipment:
Check the electrical connection for the correct voltage and fuses
(safety check according to VDE0701).
Check that all safety equipment is complete and in full working order.
Consult the operating manual for all information relating to safety (see
operating manual, chapter 3, “Safety”).
2.4 Water supply
2.4.1 Testing the water quality
Adhere to the water quality thresholds!
The quality of the cooling water (unprocessed water) and
demineralised water used has a considerable influence on the
performance and service life of the device.
Unprocessed water of drinking water quality is used for cooling and for
the optional vacuum fitting.
Demineralised water is used as feed water and for generating steam.
DIN 58951-2 states that the following thresholds must be adhered to:
(see operating manual, chapter 10, “Technical data”)
Unprocessed water quality
conductivity (at 20 °C)
< 300 µS/cm and alkaline earth ions 2.0 mmol/l,
corresponding to a total hardness of 11° dH
Demineralised water
conductivity (at 20 °C)
< 15 µS/cm and alkaline earth ions < 0.02 mmol/l
Tab. 1: Quality requirements for the water used
Test the water quality and contact your local water company. If the
values exceed the water quality requirements specified above, you
must use a water softener system to prevent scaling.
2.4.2 Connecting the cooling water supply (X and E series)
On-site conditions:
Pressure 1 bar
Connect the cooling water supply using the hose supplied.

Table of Contents

Related product manuals