Mounting and Wiring
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | more@turck.com | www.turck.com
468
14.1.2 Mounting the gateway
Please observe:
The mounting rail must already be mounted.
An end bracket must be mounted to the left of the gateway. The end bracket can be mounted
before or after the station is mounted. If the gateway is mounted first, then a space must be kept
free for the end bracket. Please read „Mount ing end brackets and end plates“ in this chapter.
The gateway is the first electronics component on a BL20 station.
When fully mounted, the gateway’s resistance to vibration is provided for by the locating hook
located on the underside of the gateway. The locating hook is moved only when the gateway is
mounted or dismounted.
Method:
† Tilt the top of the gateway towards you, position the groove provided on the rear of the gateway
onto the lower edge of the mounting rail
?.
† Tilt the top of the gateway away from you
‚ and towards the mounting rail.
Fig. 303: Mounting the gateway
‚