EasyManua.ls Logo

turck BL20 Series - 14.1.3 Mounting the base module (block or slice design)

turck BL20 Series
537 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting and Wiring
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | more@turck.com | www.turck.com
470
14.1.3 Mounting the base module (block or slice design)
Please observe:
The gateway must already be mounted.
The base modules are mounted to the right of the gateway onto the mounting rail.
The first base module following a gateway must be suitable for a Bus Refreshing module which
supplies the gateway with power.
It is recommended that the base modules should be mounted and wired before the electronics
modules are mounted.
Procedure:
Tilt the top of the gateway towards you, position the groove provided on the rear of the gateway
onto the lower edge of the mounting rail
.
Tilt the top of the base module away from you and towards the mounting rail, and press until it
locks in with an audible click .
Slide the base module as far as possible to the left until the locating hooks lock in with an audible
click into the gateway (should this be the first base module to be mounted) or into the next base
module
ƒ. This provides a stable connection and guarantees communication via the module bus.
Fig. 305: Mounting the base module for the Bus Refreshing module
NOTE
Mixed usage of base modules with screw connections and tension clamp connections is
only possible once a new power distribution module has been added. Therefor, all the fol-
lowing base modules must have the same connection technology as the power distribu-
tion module (tension clamp or screw connection).
ƒ

Table of Contents

Related product manuals