EasyManua.ls Logo

turck BL20 Series - 8.8.2 Wiring diagram

turck BL20 Series
537 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
153
2020/09
8.8.2 Wiring diagram
The terminal assignment depends on the sensor type.
Fig. 148: Connection options
NOTE
Open inputs or unused channels should not be parameterized in the operation mode PT/
NI or R because this parameterization can cause marginal measurement errors in adjacent
channels.
Should this though be is necessary due to the application, the respective channels have to
be terminated with a resistor. theresistor value has to lie within the parameterized range.
The sensor is fed from the same source as U
L
of the BL20 sys-
tem. The sensor and U
L
of the BL20 system are automatically
on the same GND potential.
Fig. 149: 4-wire-sensor (U/I)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
I +
I 
é
I +
I 
é
+
+
I +
I 
é
I +
I 
é
+
+
I +
I 
é
I +
I 
é
+
+
I +
I 
é
I +
I 
é
+
+
1
2
3
4
5
6
7
8
PT/NIU/I
2-Leiter 2-Leiter 3-Leiter
1
2
3
4
AI +
AI –
GND
24 VDC
15
16
U
L
GND
L
U
SYS
GND
SYS
E-8AI
BL20-Gateway
Analog
sensor
U
L
IN

Table of Contents

Related product manuals