D292144.7.fm Quick Start: Setup
Chapter 4: Machine Setup 4- 3
6. Setup 2D Inspection (optional)
• Ensure the 2D Camera is installed, connected and turned on.
• Adjust HMI Inspection/Test settings as needed for current job.
7. Setup Nozzle
• Ensure correct Nozzle size is installed.
8. Setup Pick Head
• Teach Pick & Place positions.
• Adjust Nozzle Vacuum Sensor settings as necessary
9. Configure End of Job Options as desired.
10. Activate Ionizing Fan (optional).