A.3 Installation Check
Test Goal
Verify that the RVP900 is properly connected to the radar system and document some basic
radar characteristics. There are
dierences for TWT/Klystron and magnetron radar systems.
Checklist
Record all values when instructed. Save the values for future reference.
Table 88 RVP Installation Checklist
Task Checked OK/Not
OK
Remarks
RVP901 Digital Receiver is properly connected to AC/DC line voltage
according to supplied power converter.
RVP901 is mounted in the radar receiver cabinet or other convenient
location.
RVP901 IF input connection.
IF Frequency (MHz): ___________.
RVP902 Signal Processor chassis installed in (circle one):
Rack
Tabletop
Distance between RVP901 and RVP902 chassis:
___________________
CAT5E Ethernet cable is connected to J2 Ethernet of RVP901 and the
other end is connected to ETH1 port of the RVP902 Server chassis.
Trigger connections verified
Magnetron Systems
IF burst pulse is connected to J13 ADC–E of RVP901.