EasyManua.ls Logo

Vortec 1600 - Toothed Belt Tension Roller, Remove and Install

Vortec 1600
183 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Industrial 1.6L Engine Mechanical 1-29
Installation Procedure
1. Install toothed belt tension roller – make sure that lug (1)
of toothed belt tension roller base plate engages in groove
(2) of oil pump.
2. Attach toothed belt tension roller to oil pump.
Tighten
Tightening torque 20 Nm / 15 lb. ft.
3. Install toothed belt – see operation Toothed Belt, Re-
move and Install.
4. Install lower part of toothed belt cover – see operation
Toothed Belt Cover – Lower Part, Remove and Install.
6. Install ribbed V–belt – see operation Ribbed V–belt,
Remove and Install.
7. Install upper part of toothed belt cover – see operation
Toothed Belt Cover – Upper Part, Remove and Install.
Toothed Belt Tension Roller, Remove and
Install
Removal Procedure
1. Remove upper part of toothed belt cover – see operation
Toothed Belt Cover – Upper Part, Remove and Install.
2. Remove ribbed V–belts – see operation Ribbed V–belts,
Remove and Install.
3. Remove lower part of toothed belt cover – see operation
Toothed Belt Cover – Lower Part, Remove and Install.
4. Remove toothed belt – see operation Toothed Belt, Re-
move and Install.
3. Remove toothed belt tension roller (1) from oil pump.

Table of Contents