EasyManua.ls Logo

WinGD X92 - Page 148

Default Icon
574 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance17151/A1
Winterthur Gas & Diesel Ltd.
2/ 2
2. Pre-tension Checks
1) Clean the threads of the bolts (2, Fig.1) and the seating surfaces.
2) Refer to 94032 and 94034. Attach the pre-tensioning jack and the applicable
equipment as shown in Fig. 2.
3) Apply a tension of 170 bar to the bolt (2).
4) Put the feeler gauge (94122) through the slot (7) to do a check for clearance between
the nut and its seating. If there is no clearance, the bolt tension has not changed and
you can do steps a) and b). If there is a clearance, do step 5).
a) Operate the vent screw (1, Fig. 2) to release the pressure to zero.
b) Remove the tools and equipment.
5) If there is clearance, the tension of the bolt has changed since the last check and you
must do steps a) to d) below:
a) Use a round bar (4) to tighten the nut (3).
b) Use the feeler gauge to make sure there is no clearance.
c) Operate the vent screw (1) to release the pressure to zero.
d) Remove the tools and equipment.
Note: The data to loosen the bolts is given in 94034.
94931 94934A
2
7
017.672/08
3
1
94935
DISC SPRINGS MUST
BE COMPRESSED
5
6
94934A
4
2
WCH02907
Fig. 2: Pretension Checks
2015
Engine Stays with Friction Shims: Pre-tension Checks

Table of Contents

Related product manuals