Maintenance
3303−2/A2
Winterthur Gas & Diesel Ltd.
7/ 12
5. Top Bearing Shell −
Removal
1) Attach the shackles (94019P) and the
chain blocks (H8, H9, Fig. 9) to the
column.
2) Attach the console frame (94326)
(Fig.10) to the bearing shell (3) with the
four screws (1).
3) Connect the chain blocks (H8, H9) to
the console frame (94326).
4) Apply a light tension the chain blocks
(H8, H9, Fig. 9).
5) Remove the two screws (2, Fig. 9).
Fig. 10
WCH03013
94326
3
2
1
6) Operate the chain blocks (H8, H9,
Fig. 11) to lower the console frame
(94326) together with the bearing
shell (1).
7) Attach the chain block (H1) to the
eyelet in the console frame (94326).
8) Operate the chain blocks (H8, H9) to
move the console frame from the
column.
9) Lower the console frame (94326) and
the bearing cover (1) to an applicable
area.
10) Remove the chain blocks (H8, H9).
11) Remove the console frame (94326).
2017
Bottom End Bearing − Removal, Inspection and Installation
Fig. 11
H1
1
H3
H8, H9
94326
94038−015
Fig. 9
H8
94019P
H9
94326
WCH03783
WCH03783