EasyManua.ls Logo

Yamaha F350B - Installing the Shift Rod

Yamaha F350B
508 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-14
Water pump and shift rod
2. Install:
• Cover “1”
• Seal “2”
• Cover “3”
3. Install:
• O-ring “1”
• Insert cartridge “2”
TIP:
• Fit the protrusions “a” on the insert cartridge
“2” into the slots “b” in the water pump hous-
ing “3”.
• Avoid the area “c” when applying ThreeBond
1533D on the water pump housing “3”.
Installing the shift rod
1. Install:
• Shift rod
•E-clip
•Plate
• O-ring
• Oil seal
2. Install:
• Shift rod assembly “1”
TIP:
• Turn the shift rod assembly “1” clockwise or
counterclockwise 90, and then push it down
so that the tip “a” of the shift rod fits into the
groove “b” in the shift slider.
• Check that the shift rod operates smoothly.
Installation depth “a”
10.25–10.75 mm (0.404–0.423
in)
1
2
3
New
a
b
c
2
3
1
A. Regular rotation model
B. Counter rotation model
New
New
b
a
90°
1
a
A
b
a
90°
1
a
B

Table of Contents