9-15
Upper case
3. Install:
• Dowel pin “1”
• Rubber seal “2”
• Rubber seal “3”
• Rubber seal “4”
• Oil pan assembly “5”
• Oil pan assembly bolt “6”
• Oil pan assembly bolt “7”
• Anode “8”
• Anode screw “9”
• Cooling water pipe “10”
• Make sure to fit the tip of the cooling water
pipe “10” into the joint hole “a” in the upper
case.
• Tighten the oil pan assembly bolts “6” and “7”
to the specified torque in the order [1], [2],
and so on.
4. Install:
•Damper
• Cover
• Gasket
• Drain bolt
8
6
6
7
7
9
9
1
4
3
5
10
a
2
10
2
[3] [2]
[4]
[2]
[1], [5]
[1], [3]
Oil pan assembly bolt (M8) “6”
20 N·m (2.0 kgf·m, 15 lb·ft)
Oil pan assembly bolt (M10) “7”
42 N·m (4.2 kgf·m, 31 lb·ft)
Anode screw “9”
3.9 N·m (0.39 kgf·m, 2.9 lb·ft)
Drain bolt
27 N·m (2.7 kgf·m, 20 lb·ft)