9 Commissioning
Commissioning the LITECOM system entails the following steps:
· Connecting to the LITECOM CCD control device for the first time and defining basic settings:
o Configuring the administrator for the first time (language, terms and conditions, password)
o Configuring the LITECOM CCD control device for the first time (name, network settings, date and time,
geographical coordinates)
· Testing the installation
· Running the addressing wizard to create rooms and groups and address devices
Note
· The addressing wizard guides the user through the individual steps of addressing and provides
related assistance.
· Alternatively, rooms and groups can be created via the System image app and then devices can
be addressed using the Addressing app.
For more information see Section System image or Section Addressing
· Backing up data
As soon as commissioning is complete the installed luminaires can be controlled.